在《PONS词典》中的词汇
I. try [traɪ] 名词
II. try <-ie-> [traɪ] 动词 不及物动词
III. try <-ie-> [traɪ] 动词 trans
1. try (attempt to do sth):
3. try (sample):
4. try (put to test):
I. trot [trɒt, 美 trɑ:t] 名词
2. trot (walk):
3. trot (run):
4. trot 俗 (diarrhoea):
II. trot <-tt-> [trɒt, 美 trɑ:t] 动词 不及物动词
3. trot (run):
trap2 [træp] 名词 usu pl
trap 解剖 ……的缩写 trapezius (muscle)
trod [trɒd, 美 trɑ:d] 动词
trod pt, 过去分词 of tread
I. tread <trod [or 美 a. treaded], trodden [or trod]> [tred] 动词 不及物动词
1. tread (step):
短语,惯用语:
II. tread <trod [or 美 a. treaded], trodden [or trod]> [tred] 动词 trans
| I | try | |
|---|---|---|
| you | try | |
| he/she/it | tries | |
| we | try | |
| you | try | |
| they | try |
| I | tried | |
|---|---|---|
| you | tried | |
| he/she/it | tried | |
| we | tried | |
| you | tried | |
| they | tried |
| I | have | tried | |
|---|---|---|---|
| you | have | tried | |
| he/she/it | has | tried | |
| we | have | tried | |
| you | have | tried | |
| they | have | tried |
| I | had | tried | |
|---|---|---|---|
| you | had | tried | |
| he/she/it | had | tried | |
| we | had | tried | |
| you | had | tried | |
| they | had | tried |
无例句可用
请尝试其他词条。
互联网提供的例句(未经PONS编辑处理)
[...]
www.syperion.de We provide services from Technology Readiness Level (TRL) 2 to 9, which ensures a continuous and fast processing.
[...][...]
Wir bieten Leistungen vom Technology Readiness Level (TRL) 2 bis 9 an und stellen somit eine kontinuierliche und schnelle Bearbeitung sicher.
[...][...]
euro.vdma.org Support measures for later stage projects (higher TRL) should be carefully analysed for their potential and risks – ideally together with relevant industrial stakeholders – and should be in line with industrial innovation processes in terms of speed, flexibility and accessibility.
[...][...]
Fördermassnahmen für marktnahe Aktivitäten müssen sorgfältig auf Chancen und Risiken untersucht werden und hinsichtlich Geschwindigkeit, Zugang und Flexibilität industriellen Innovationsprozessen entsprechen.
[...][...]
www.teleconsult-austria.at The project aims to provide system design and safety concept elements as well as a demonstrator that are derived by strict adherence to processes applying formal certification requirements (TRL level 2 – 4).
[...][...]
Als Projektergebnis wird eine Systembeschreibung und ein Sicherheitskonzept inklusive Demonstrator-Entwicklung angestrebt (TRL 2 – 4), welches sich in den zentralen Elementen (formal und inhaltlich) an den Erfordernissen einer Zulassung anlehnt.
[...]