Generation capacity was not enough to meet peak demand, which translated into continuous supply constrains and widespread blackouts lasting up to 20 hours.
An approximately 10% reduction in peak demand (achievable depending on the elasticity of demand) would result in systems savings of between $8 to $28 billion.