The westbound carriageway will be closed overnight, between 8pm and 6am, with all traffic travelling in a contraflow system on the eastbound carriageway.
The construction method used was to demolish and build one carriageway at a time the southern half was dismantled first whilst a contraflow system operated on the northern carriageway.