It uses a work-in-progress limited pull system as the core mechanism to expose system operation (or process) problems and stimulate collaboration to continuously improve the system.
The construction proved to be a fairly simple concept; scrape off soil and expose the white coral - then level out the coral for a good, sound runway surface.