This lost stand seems to have been built to a different design, using an innovative application of pre-stressed concrete to contain liquid oxygen spills.
It is constructed of reinforced concrete deck slab cast integrally with 10 pre-stressed concrete legs triangulated to meet the hinges enclosed within the abutments.