A small yet powerful sandblasting tool that would sandblast and vacuum simultaneously was developed specifically for the removal of the stubborn coating.
The $14 million rehabilitation project, substantially completed 07/01/2013, involved steel and concrete repairs, sandblasting and repainting and replacement of bridge joints.